Post placeholder image
May 16, 2012 in REAC

REAC Tips

Recently a question was raised about a wood frame shed that met all the conditions of the definition of a building, except that it was anchored to a 12-inch diameter poured concrete pier. Is a pier fo ...

Read More
Post placeholder image
March 20, 2012 in REAC

REAC Tip

There is an issue regarding REAC inspectors’ responsibilities concerning fire alarm systems and unit call-for-aid devices, especially if the system is monitored off-site by a third party. The inspecto ...

Read More
Post placeholder image
February 24, 2012 in REAC

REAC Tips

REAC has been receiving questions concerning Windows and Blocked Exits. REAC has responded with some tips that will help everyone in the industry. Windows that are inoperable and not lockable will rec ...

Read More